Quincy, Washington
CTS Flanges were installed during development of the Microsoft Data Center six building complex built on the 74 acre block of land in Quincy, Washington. Hundreds of Flanges were used in the installation over various applications. The centre is supported by hydro-electric power from nearby dams on the Columbia River hence long lasting Flanges with electrolysis protection were required.